W-27 Disaster Managemnet Plan for the Juba and Shabelle Basins in Somalia

English
Technical report
Title Language: 
English
Language: 
Abstract: 
This Contingency Plan articulates what the Federal Republic of Somalia Government through Disaster Management Authority (DMA) and with the support of partners will do to prevent or reduce any potential adverse impacts emanating from floods and drought disasters. Within this context, the Contingency Plan aims to prepare for and adequately respond to any of these common disasters when they evolve beyond the coping capacity of stakeholders. It was developed through a participatory and inclusive multi-stakeholder process and aims to promote a coordinated approach to preparedness and response before, during and after disasters. In addition, the Plan is in line with provisions of the DMA Strategic Action Plan for 2016 that proposes to put in place an early warning system to help instill Disaster Risk Reduction (DRR) mechanisms in averting or minimizing the impact of disasters and also in the creation of effective emergency response and recovery plans. One of the outcome of the training of Disaster Risk Reduction (DRR) and Early Warning (EW) held from 11th to 15th October 2015 in Mogadishu was the prioritization of key hazards likely to require contingency measures. These were identified as mainly drought and floods but with other minor ones such as land degradation, epidemics, conflicts, and pest infestation. The prioritized hazards identified in the Contingency Plan were developed with three scenarios. The most likely scenario envisages that there will be drought due to the failure of seasonal rainfall or flooding characterized with above normal rainfall in some parts of the country especially the Juba and Shabelle River Basins. As a result households will be affected and in both cases require assistance for a stipulated period of time.
Date of publication: 
January, 2016